Loch Lomond Marina Letter from
Loch Lomond Marina Committee |
November
5, 2004
In
a separate letter, I have conveyed to you our committee’s
concern that the meeting scheduled for November 10 is premature
since all procedural requirements for the approval of draft
General Plan 2020 have not yet been completed. As
a result, any attempt to evaluate a design proposal for
the Loch Lomond Marina as to its consistency with that
Plan is working against a still moving target.
That
said, the committee felt it appropriate to comment on the
latest proposed design in order to keep the dialog active
while the General Plan 2020 revision and approval process
continues. Overall,
we found this most recent design a move in a positive direction. We
found the broad entrance causeway at Loch Lomond Road attractive
and in keeping with our desire for maintaining views from
Pt. San Pedro Road to the Bay. We also liked the “Loch Lomond
Commons” placed at the bay front as well as the wide
boardwalk and marina green along the bay frontage. We
also are in favor of the more extensive implementation
of single-family cottages and houses, especially the cottages.
However,
there are still elements of the design that are in need
of improvement before a final design will be acceptable
to our members and Associations. In no particular order or priority,
these are:
1.
A single access/egress
to this property is unacceptable from both a traffic and
fire/safety perspective. The
design must incorporate a second access/egress as exists
today to avoid traffic congestion at peak periods (summer
months and commute hours). This will be an especially bad
situation when boat trailers, retail customers and residential
drivers all are attempting simultaneous access/egress.
2.
There is inadequate
commercial retail space (10,400 sq ft) in this design to
accommodate the requirements of the neighborhood for a full-service
grocery, cleaners and other retail services.
3.
We are concerned
that a 50’ setback at the wetlands is insufficient
and will be harmful to the flora and fauna. We
request a 100’ setback. Furthermore, reinstatement
of the wetlands immediately east of Bruno’s, illegally
filled in 2001, should be required before appropriate set
backs can be determined.
4.
The row of cottages
along Pt. San Pedro road appears to be too close to the road
for sound mitigation. This
design would then require a sound wall to meet sound mitigation
requirements. As has been stated before, we are
utterly opposed to a sound wall. We
feel that these units need to be set further from the road
to meet sound requirements.
5.
We are concerned
about adequate day use trailer parking during peak period,
especially the summer months. 20
spaces are totally inadequate for busy weekends which often
see in excess of 40 boat trailers parked throughout the marina
property. This low number of spaces will force day use trailer
parking onto Pt. San Pedro Road and into neighborhoods.
6.
The single, large “U-shaped” townhouse
in the middle of the property presents a visual barrier that
is contrary to the concept of an open view to the Bay. We suggest that all the townhouse
buildings be replaced with smaller buildings that have 3-4
townhouses each rather than fewer but larger units of multiple
townhouses.
7.
We would prefer
to see the cottages, houses and townhouses be mixed in the
design rather than clustered with similar units. This
would present a more varied and pleasing appearance.
8.
Without more
detailed information about the design of these units, it
is difficult to determine the visual impact. We
would like to see a mix of 1 and 2 story units (houses, townhouses
and cottages) to avoid a “wall” effect and to
add variety. In no case, should any unit or
commercial building exceed 2 stories.
9.
We continue to
be concerned about the long-term viability of a full-function
grocery given the existing lease to Bruno’s and the
concept of a 2-phase construction plan to accommodate that
lease with the current grocery store owner. If the planned commercial space
is constructed, it will be occupied in order to generate
revenue. At the end of the grocery contract,
the existing building would be removed, but there would then
be no empty space to which the grocery could relocate. The
result would be no grocery store at the end of the existing
lease. We request
that one of two approaches be agreed upon by the Planning
Commission and the developers:
These concerns
and suggestions are presented to the Planning Commission
and the developers in the spirit of cooperation and the
desire to ensure both a financially viable project for
the developers and an esthetically acceptable result for
our community. We are confident that such a conclusion
can be obtained.
Sincerely
yours,
David Tattersall cc:
Bob Brown, Community Development Director
|